Skip to content

Short answer: Most small CPG brands start in spreadsheets, move to an inventory app linked to their store and accounting once they sell through several channels, and only need an ERP when they run many SKUs, warehouses or co-packers. Whatever the tool, a plan only works if it’s tied to supplier lead times and your co-packer’s schedule, so every material lands before the run.

What should a small CPG brand track?

Which tools do small CPG brands use?

Tool Good for Outgrown when
Spreadsheets One or two channels and a handful of SKUs Several people edit it, or the numbers live in many tabs
Inventory apps linked to your store and accounting Multi-channel sales and stock across 3PLs You need to plan materials for co-packer runs
ERP or MRP software Many SKUs, your own production, lot tracking at scale Rarely worth the cost and setup for a small brand

How do you plan a production run?

  1. Set the run date with your co-packer and work back from it.
  2. List every ingredient and packaging item the run needs (your bill of materials).
  3. Subtract what’s already at the co-packer, then order the rest with each supplier’s lead time in mind.
  4. Confirm every delivery lands before the run, with paperwork such as COAs and spec sheets in place.
  5. After the run, record yields and leftovers so the next plan starts from real numbers.

Why do production runs slip?

A run rarely slips because of the plan itself. It slips because one supplier is late, a minimum order forces a bigger buy than planned, or nobody chased a confirmation. The more suppliers feed one run, the more follow-up it takes.

How Opply helps

Opply runs CPG operations end to end, and inventory management and production planning are coming to Opply. Today, Purchase Order Automation places every order a production run needs with each of your suppliers, chases confirmations and delivery dates, and keeps one current status for the whole run. You keep your existing suppliers, and you’re only pulled in when something needs your call.

CHUH, a canned matcha latte brand, starts each production run in Opply: orders to nine suppliers and one co-packer placed in one go. Opply’s team covers core UK and US business hours, so orders aren’t monitored overnight or at weekends.

Book a 30-minute demo built on your own suppliers and orders

FAQ

What is a bill of materials? The list of every ingredient and packaging item, with quantities, needed to make one batch of a product.

Do small CPG brands need an ERP? Usually not at first. A spreadsheet or an inventory app works until SKUs, sites or co-packers multiply.

How far ahead should I plan a production run? Far enough to cover your slowest supplier’s lead time plus a buffer. For many small brands that’s six to twelve weeks.

Welcome to Opply!

Fill in a few details before connecting with us!

  • I'm a buyer
  • I'm a supplier